loader image
Apprenticeship Opportunities

Manned 24 hour Call-out Service

Edinburgh Instruments – Boiler Replacement


Client: Edinburgh Instruments
Project length: 1 Month
Project value: £33,700
Completion date: August 2019
HF divisions involved: Plumbing, Heating & AC,Mechanical

heating systems installation

Brief project description:  Strip out of the existing heating systems and replacing with new energy efficient boilers as Edinburgh Instruments request.

Project Challenges: It was important to work with the client to ensure a minimum of downtime of heating and hot water services.

Justin Omond the production manager for site has stated that the new boilers is one step forward in taking the company in their chosen direction of becoming more energy efficient. The next step is to bring the existing BMS up to date with HF’s help and guidance.

facilities management case studies
CASE STUDIES

Browse our latest case studies...

LATEST NEWS
Understanding the Hochiki Protocol

Enhancing Fire & Security Installations The efficacy of communication protocols cannot be overstated when it comes to fire detection systems. These protocols serve as the backbone of systems, ensuring seamless operation, swift response times, and reliable data transmission. Among the myriad protocols available, one stands out for its robustness and versatility and is quickly becoming […]

  • NSI Gold Fire & Security
    NICEIC Electrical Contractor
    Gas Safe Engineers
    REFCOM accredited heating engineer
    Select Electrical Contractors
    construction line accreditation
    CHAS Accredited contractor
    SMI PEF Contractor
    BAFE Fire Safety Registered Contractor
    OFTEC Registered Heating Business
    accreditation-1
    accreditation-1
    accreditation-1
    accreditation-1
    accreditation-1
    accreditation-1
    accreditation-1
    accreditation-1
    accreditation-1
    OFTEC accreditation