A Company Well Connected

The Citizen, St Vincent Place, Glasgow, Scotland – Electrical Refit

Client: Hugh Stirling Ltd, Glasgow, Scotland
Completion date: September 2017
HF divisions involved:Electrical

Brief project description: Full Electrical Services Strip out and replacement.

The Citizen bar and dining rooms are set in the beautiful surroundings of this completely restored grade A1 listed building. Founded in 1842,The Evening Citizen was one of the first evening Newspapers in Glasgow.

In 1889 the paper’s publishing offices moved into 24 St. Vincent Place, Glasgow purpose built and Scotland’s first Red Sandstone building. This was also one of the first buildings in the city to be fully electric.

Project Challenges overcame: Any works within a Grade A1 listed building are not without challenges, but here at HF it’s an area that we excel in, with a vast experience of working within this type of property.

Installation Time: 40 days

 

                                     

 

 

Return to Case Studies >>>

CASE STUDIES

Discover examples of project work we have done in all our sectors.

LATEST NEWS
Prepare to open with vital safety checks

When you business premises have stayed closed for so long, there are certain safety checks that must be carried out to the building before staff or customers can safely enter the building. Electrical safety inspections Fire alarm maintenance Emergency light maintenance Gas Safety Checks Intruder and CCTV maintenance PAT testing Recommissioning of water systems Air […]

  • ACCREDITATIONS

    Slider

  • Private Login