Manned 24 hour Call-out Service

Crerar Hotel Group

Client: Crerar Hotel Group
Project length: 6 months
Project value: £150k +
Completion date: April 2022
HF divisions involved: Electrical, Mechanical

creara hotel swimming poolBrief project description: HF were contracted to complete the refurbishment of the Crerar Hotel Spa and Swimming Pool area.

The existing swimming pool at the hotel was refurbished with new LED lighting and emergency lighting system installed.

Additional electrical installation work took place in the treatment rooms, changing rooms, toilets and Spa reception. We also installed electrical designer radiators as part of a new heating system in the Spa.

Our Mechanical Division were responsible for the installation of a brand new air conditioning system as well as the design and fitting of new ventilation system for the Swimming Pool and Spa area.

Before-Pic
The Swimming Pool before we began work
Before-Pic-2
The Spa area before we started work
After-Pic
The Swimming Pool area after we have completed our work
After-Pic-2
The Spa area after we had installed the LED lighting

Project Challenges:
The entire project had to be completed while the main hotel was still operational.  This meant that our Electrical and Mechanical work had to be scheduled around busy hotel activities during the course of the day to ensure minimise disruption both to the hotel staff but also, most importantly for the hotel guests.

This was particularly challenging when we have to shut off the electrical supply to the entire hotel which was necessary in order to connect the Hotel and Spa Distribution Boards.

Working in a specialist environment such as a swimming pool is deemed as a ‘Special Installations of Locations’ job that forms a significant part of the Requirements for Electrical Installation. This means that we have to follow strict installation guidelines to ensure that all electrical installation work was fully compliant with current standards.

Find out more

The HF Group of companies offers clients an unsurpassed level of genuinely in-house capabilities and senior-level hands-on management from initial planning to final handover. For our customers, whether they be in hospitality, manufacturing or one of the many other sectors that we work in, it gives them the opportunity to tap into a wide range of services and a team of consultants with a skills base and command of technologies which are second to none.

We have diversified and developed abreast of industry advancements and have grown into a group of world-class companies leading the way in next-generation technologies; and all with a family continuity at management level which is rarely seen. Faced with today’s business challenges – recessions, pandemics, takeovers and mergers, this is testament to HF’s truly outstanding approach.

Hugh M Fulton – Group Chairman says:

“Experience shows. Our strong ‘family’ system is based on cohesion, flexibility and communication. We have a proven track record of delivering results and a truly quality service.”

a company well connected

Kinning Park Complex

Client: Kinning Park Complex
Project length: 20 weeks
Project value: £700k +
Completion date: March 2022
HF divisions involved: Electrical, Mechanical, Plumbing, Heating & AC, Fire & Security, Automated Controls

Brief project description: HF were contracted to complete the Electrical, Mechanical and Fire & Security work for the refurbishment of the old Kinning Park Primary School that has been used as a local community centre since 1979. The job required multiple divisions of the HF Group included Automated Controls to be utilised as we help convert the historic building up to modern standards.

« of 2 »
electrical contractor for commercial work

Electrical – Our electrical division were responsible for the complete installation of brand new mains power source, including upgraded CT metering and the installation of Distribution Boards throughout the building. As part of the complete rewiring of the building, we also fitted new electrical wiring from local distribution boards to new LED light fittings (and refurbished and upgraded fittings) as well as additional small power outlets.

The architectural designs required for the job included dimming controlled lighting in set ground and first floor open plan areas.

Working alongside our Mechanical division, we were responsible for the installation of new commercial kitchen equipment and the installation of Smoke Vent controls (required by our Fire & Security Division) that were connected to the roof Velux windows with main and remote panels located as required.

An elevator was installed by a specialist lift fitting contractor and to ensure the building was compliant, we a installed disabled refuge system on all main and half landing levels of the building that can be used in the event of an emergency.

We ensured that we stayed in close contact with our fellow contractors within HF to assist with power supplies and control requirements where necessary.

mechanical contractor for hvac plumbing and heating services

Mechanical – Our Mechanical Division were tasked with the installation of the buildings brand new central heating system and plumbing system.  This included everything from new combi boilers to radiators, pipping, sink units, toilets and showers.

Because of the age of the building, we fitted a new Gas supply for both boilers and kitchen cooking equipment.

Our HVAC team were also tasked with installing new ventilation and extraction systems throughout the building.

fire & security installers

Fire & Security – Our Fire & Security engineers installed a brand new L2 fire alarm system throughout the building that connected to various Mechanical installed gas systems.  We fitted a variety of Security devices and CCTV cameras across the site ranging from tamper alarms on windows to motion sensors in hallways, bell boxes and security lighting outside. We installed video and pin code Access Control Systems that use simple to operate control handsets installed and interlinked across all offices throughout the building.

Controls Jobs

Controls – Our Automated Controls team were contracted to design, build and install a main control panel for the site that would be located within the plant room of the building. The control system included wire to all valves and pumps and was linked with newly installed zonal thermostats throughout all levels of the structure. The controls system our team designed included built and wired controls for kitchen extract and intake fans as well as heating battery controls for both the kitchen and ground floor toilet areas.

Project Challenges:
The architect/interior designers wanted to keep the authentic rustic look and feel of the original school building where possible.  This meant that we had to work around existing interior design features. The Kinning Park Complex was originally built in 1910 as the science block of Lambhill Street Secondary School.  Due to the age of the building, difficult access restrictions and the complex nature of rewiring such an old building while installing new plumbing and heating systems – all while ensuring that the building met the latest fire and security standards –  understandably had its challenges.  But as ‘A Company Well Connected’, we can provide Electrical, Mechanical, Fire & Security as well as Control System services all under the one roof.  This means that through experience, skill and inhouse communication, our team were able to work through any obstacle that popped up during the site fitting.

 

Find out more

The HF Group of companies offers clients an unsurpassed level of genuinely in-house capabilities and senior-level hands-on management from initial planning to final handover. For our customers, it gives them the opportunity to tap into a wide range of services and a team of consultants with a skills base and command of technologies which are second to none. We have diversified and developed abreast of industry advancements and have grown into a group of world-class companies leading the way in next-generation technologies; and all with a family continuity at management level which is rarely seen. Faced with today’s business challenges – recessions, pandemics, takeovers and mergers, this is testament to HF’s truly outstanding approach.

Hugh M Fulton – Group Chairman says:

“Experience shows. Our strong ‘family’ system is based on cohesion, flexibility and communication. We have a proven track record of delivering results and a truly quality service.”

a company well connected

Edinburgh Instruments – Boiler Replacement

Client: Edinburgh Instruments
Project length: 1 Month
Project value: £33,700
Completion date: August 2019
HF divisions involved: Plumbing, Heating & AC,Mechanical

heating systems installation

Brief project description:  Strip out of the existing heating systems and replacing with new energy efficient boilers as Edinburgh Instruments request.

Project Challenges: It was important to work with the client to ensure a minimum of downtime of heating and hot water services.

Justin Omond the production manager for site has stated that the new boilers is one step forward in taking the company in their chosen direction of becoming more energy efficient. The next step is to bring the existing BMS up to date with HF’s help and guidance.

Selkirk Leisure Centre

Client: Live Borders
Completion date: June 2017
HF divisions involved: Mechanical

Supply and fit of new Worcester GB162 heating boilers connecting to existing pool water heating and heating coils within the Ahu’s along with new Dakin Air Handling Unit ,DX Coils and ductwork to suit existing pool ventilation for heating and cooling.

Project Challenges overcame: Size of Ahu for positioning and routing of ducting to within the plantroom, Replacement flues to the new boilers and pressurisation of the systems.

Mechanical heating oilers  supply heating boiler installation

Installation Time: 2 months

Meadow Court Student Accommodation

Client: Meadow Court Student Accommodation
Completion date: Ongoing
HF divisions involved: Mechanical

Brief project description: Full Services Strip out and replacement, Replacement bathrooms and new build communal area

Project Challenges overcame: Timescales set by client due to start of University Term

student accommodation heating systems student accommodation bathroom fitting

Installation Time: 10 days

Air Conditioning Installation for Arron House Nursing Home, Penicuik

Client: Arron House Nursing Home
Project length: 2 Days
HF divisions involved: Plumbing, Heating & AC

Contract value: £3,500

New Mitsubishi MUZ-SF35VE-E4 Split air conditioning system installed to cool a storage cupboard in a busy nursing home located in Penicuik.

The M Series range is designed to cool or heat small spaces whilst providing a versatile, yet affordable air conditioning solution.  The M Series is quick to install and includes one of the quietest units on the market.

Installed and commissioned by HF Mechanical Gas qualified engineers and within timescales allowed.

 

Nursing Home Air Conditioning Nursing Home Air Conditioning Installation